A Client of Fabri Consulting since our formation in 2005, Fabri have successfully completed many Projects in the UK for SHELL including, recently...

Kero Marker Dye Project

Introduction of HMRC compliant Kerosene Marker Dye system at Shell Haven terminal requiring a containerised additive unit (C/W tank and pumps), dedicated kerosene loading gantry & injection and new dedicated slops system. Complete project from feasibility study through to commissioning.

  • Full EPCM

  • Compliance with Shell ODM process

  • HMRC compliance and approval

  • HAZOP

  • Mechanical, EC&I & Civil/Structural detailed design

  • Construction management and supervision

  • Commissioning and handover

Year / Budget

2017 / £750K

 

Project Managers

Thomas Knight (Fabri) / Paul Comblain (Shell)

 

Shell Haven Aviation Project

An ambitious time driven project requiring new loading pumps, aviation filtration, gantry & modification to existing gantries.

  • Full EPCM
  • Compliance with client ODM process
  • HAZOP & LOPA studies
  • Mechanical, EC&I & Civil/Structural detailed design
  • Construction management and supervision
  • Commissioning and handover

Year / Budget

2015 – 2016 / £1.8 million

More images of Shell Haven Aviation Project

Haven Terminal ROSOV Project

A project to determine the requirements for Remotely Operated Shut Off Valves (ROSOV) in accordance with HSE guidance and recommended practices.

  • Identify / Assess and Select phases
  • Review of site COMAH Safety Report against HSE guidance  HSG 244

  • Implement Primary Criteria Assessments in accordance with
    HSG 244

  • Implement Secondary Criteria Assessment in accordance with HSG 244

  • Cost Benefit Analysis (CBA) for tank side ROSOV’s

 

Year / Budget

2015 – 2016 / £1 million

 

Project Manager

Andrew McCann (Fabri) / Chris Llewellyn (Shell)

 

Kingsbury V-Power Project

Introduction of Shell V-Power grades into a joint venture site (Shell/BP) requiring new additive tankage, offloading and loading capabilities, modifications to the existing ethanol system and modifications to road loading gantries. Complete project from feasibility study through to commissioning.

  • Full EPCM

  • Compliance with Shell ODM process and BP CVP process

  • Gap analysis of Shell DEP’s Vs BP ETP’s

  • HAZOP & LOPA studies

  • Mechanical, EC&I & Civil/Structural detailed design

  • Construction management and supervision

  • Commissioning and handover

 

Year / Budget

2016 / £1.1 million

 

Project Managers

Thomas Knight (Fabri) / Chris Llewellyn & Trevor Allinson (Shell)

 

Other SHELL UK Limited Projects at a glance

Projects complete at multiple sites across the UK;

  • Automation systems replacement
  • Drawing and document management
  • Area classification reviews
  • Additive injection facilities
  • Gantry shut down valves
  • EEx Inspections
  • SIL verification
  • HSE support

 

Projects complete at Jarrow terminal;

  • Pump replacement
  • Rail side fire protection
  • Import line metering
  • Due diligence review / 10 year plan

 

Projects complete at Stanlow terminal;

  • Additive tanks gauging
  • Introduction of bio fuels
  • Control room design

 

Projects complete at Kilingholme terminal;

  • Introduction of Mogas additive
  • Additive pump replacement

 

Year

2005 - 2016

 

 

 

 