BP IST

 

Following on from a long working relationship with BP IST, Fabri Consulting have worked closely with BP IST Project Managers to deliver Projects at various locations around the globe........

Europoort Refinery Rotterdam

BP Integrated Supply and Trading (IST) requested Fabri Consulting Engineers to perform a Feasibility study into options for two of its trading benches; GRES and GDIST. With reference to this study the GRES bench is associated with all fuel oil products and the GDIST bench is associated with all distillate products.

 

The study reviewed options for tank storage of up to 440,000m3 for heated and non-heated tankage.

 

Project Managers

Douglas Burns (Fabri) / Nico Roos (BP) 

Nacala Terminal, Mozambique

An ambitious schedule driven project to get a recently purchased terminal operational for gasoil storage and distribution. The project included assessing and modifying the existing infrastructure inclusive of new pumps, tank modifications, fire protection, conversion of loading gantries and allowance for future expansion.

  • Full EPCM
  • Compliance with client CVProcess
  • HAZOP & LOPA studies
  • Mechanical, EC&I & Civil/Structural detailed design
  • Construction management and supervision
  • Commissioning and handover

Project Managers

Thomas Knight(Fabri) / Stijn Van Zelst (BP) 

Nacala, Beira and Matola Terminals, Mozambique

Technical due diligence review of BP terminals Mozambique with the aim of identifying the upgrades required to align the sites with BP’s Engineering Technical Practices (ETP).

  • ETP gap analysis
  • Risk analysis
  • FEHMP review
  • Operating procedures review
  • Cost estimating to close out actions

Project Managers

Douglas Burns(Fabri) / Jason Rajah (BP) 

ATAS Terminal, Turkey - Commissioning Manager

Commissioning / Commissioning Management of Refinery to Terminal conversion Project, including

  • Fixed / Floating Roof tankage, piping and pumping systems
  • Fire / Foam Fighting Systems
  • HV / LV Switchgear
  • SCADA system
  • Tank Gauging
  • Actuated Valves
  • Contractor ATEX training

Year / Budget

2006 - 2007 / $100M

 

Project Managers

Dave Burnett (Fabri) / Stijn van Zelst(BP IST) 

Other BP IST Projects 2006 - 2016......

The majority of projects completed for IST are covered under confidentiality agreements as they are typically assessing investment opportunities for BP.

 

These projects can range from feasibility studies in areas of potential new markets to expansion of existing facilities to increase market share in existing markets.

 