BP Integrated Supply and Trading (IST) requested Fabri Consulting Engineers to perform a Feasibility study into options for two of its trading benches; GRES and GDIST. With reference to this study the GRES bench is associated with all fuel oil products and the GDIST bench is associated with all distillate products.
The study reviewed options for tank storage of up to 440,000m3 for heated and non-heated tankage.
Project Managers
Douglas Burns (Fabri) / Nico Roos (BP)
An ambitious schedule driven project to get a recently purchased terminal operational for gasoil storage and distribution. The project included assessing and modifying the existing infrastructure inclusive of new pumps, tank modifications, fire protection, conversion of loading gantries and allowance for future expansion.
Project Managers
Thomas Knight(Fabri) / Stijn Van Zelst (BP)
Technical due diligence review of BP terminals Mozambique with the aim of identifying the upgrades required to align the sites with BP’s Engineering Technical Practices (ETP).
Project Managers
Douglas Burns(Fabri) / Jason Rajah (BP)
Commissioning / Commissioning Management of Refinery to Terminal conversion Project, including
Year / Budget
2006 - 2007 / $100M
Project Managers
Dave Burnett (Fabri) / Stijn van Zelst(BP IST)
The majority of projects completed for IST are covered under confidentiality agreements as they are typically assessing investment opportunities for BP.
These projects can range from feasibility studies in areas of potential new markets to expansion of existing facilities to increase market share in existing markets.
Year
2006 - 2016