Design Basis Study to provide operational Crude Import, Blending, Storage (1,600,000 m3) and export systems.
The import/export to ship mooring / connection point proposed via 2 off 24” pipelines approximately 19.7 km in length.
The import/export rates to be 6,000 m3/hr.
Year / Budget
2009 - 2010 /
Project Managers
Douglas Burns (Fabri) / Stijn van Zelst(Verwater)
Working in conjunction with Verwater, Fabri Consulting advised on several 'common interest' Projects:
Year / Budget
2013 - 2016 /
Project Managers
Douglas Burns (Fabri) / Stijn van Zelst(Verwater)