Piping design and stress analysis was completed for removal of buried pipework. The project looked at various options associated to the removal of the buried sections of pipework with the agreed solution to allow for a new pipe bridge.
Year
2020
Project Managers
Michael Cummings (Fabri) / Jonathan Kilpatrick (IKM)
The project required new header blending skids to tie into the existing refinery ethanol pumping system to enable the supply of 18 ULP gantry arms and 5 ULSG gantry arms.
Year / Budget
2010 - 2011 / £1M
The project required modification to the existing out of use LRP system with new additive skid and injection point tie ins to 5 gantries to supply marker dye injection to 10 loading arms.
Year
2010 - 2011
As a result of the ethanol header blending, during meter proving returns the product was getting double dozed with ethanol. The project was to prevent this from happening while allowing the product to sold.
Year
2010 - 2011